Safer Harbors, Stronger Trade Alexandria New Breakwaters – Dekheila Port
Project Overview
Client: Ministry of Transportation – Alexandria Port Authority
Location: Dekheila, Alexandria, Egypt
Duration: April 2023 – October 2024
Project Type: Marine Breakwater Construction
This landmark development involves building advanced breakwater systems to safeguard Dekheila Port, improve marine operations, and integrate it seamlessly with Alexandria Port. The result will be a major, unified harbor serving as a strategic gateway for international trade in the Mediterranean.
During excution














Scope of Work
Construction of Western Breakwater – 1,438m length
Construction of Southern Breakwater – 590m length
Foundation works with 30–300kg rock core
Armor layer with 1–3 ton rocks
Final armor with 12.25 & 43‑ton tetrapod blocks
Construction of vertical concrete crown
By delivering world‑class breakwater infrastructure, this project ensures long‑term port protection, doubles operational capacity, and reinforces Egypt’s position as a key player in global maritime trade.